Skip to content
Home
Households
Business customers
About usNewsCareersContactAbbreviation Glossary
Dispatch 24/7 info@greenairtech.cz
Published 1 September 2025

Have you completed the mandatory inspection under Decree 38/2022 Coll.?

Per the update effective 1 January 2023, the owner must have an inspection of operated systems carried out once every 5 years. The penalty for non-compliance can reach up to CZK 200,000.

Per the update effective 1 January 2023, the owner must have an inspection of operated systems carried out once every 5 years. The penalty for non-compliance can reach up to CZK 200,000.

The obligation applies to buildings with heat sources exceeding 70 kW, including those outside buildings. The inspection of operated systems — HVAC, heating, cooling, and cogeneration units — may only be performed by a certified energy specialist and is recorded in the ENEX database, administered by the Ministry of Industry and Trade. We will arrange this for you, including follow-up diagnostics, system balancing per Decree 193/2007 Coll., and pressure vessel inspections.

All news