HVAC and cooling for an office building in Karlín

Replacement of two AHU units and reconstruction of cooling distribution in a six-storey building — while tenants remained in full operation.

Scope of Work

The building owner needed to replace end-of-life units and increase cooling capacity without requiring tenants to vacate their offices for even a single day.

  • Dismantling and replacement of two rooftop AHU units, including nighttime crane operations
  • Reconstruction of cooling distribution on floors 3–6
  • Installation of new fan coils in office spaces
  • Expansion of measurement and control system and integration with the existing BMS
  • Phased execution by floor to ensure continuous operation

Outcome

The building operated throughout the project with no loss of rental income. The new units with heat recovery reduced HVAC energy consumption, and tenants were able to maintain comfortable temperatures even in August for the first time in years.

Project Parameters

Location
Prague 8, Praha
Completed
May 2026
Area Served
6 200 m²
Duration
7 měsíců
Category
HVAC, Cooling

Technologies Deployed

AHU with heat recovery (ZZT) Water-based cooling Fan coils BMS integration