Skip to content
Business customers Switch to the other section
Home
Households
Business customers
About usNewsCareersContactAbbreviation Glossary
Dispatch 24/7 info@greenairtech.cz
Business customers

Air conditioning and ventilation for a polyclinic in Písek

Consultation rooms, waiting areas, and a laboratory. Each with different requirements for air quality and noise levels — and nowhere could any noise be tolerated.

Scope of Work

The healthcare facility needed to address summer overheating in consultation rooms and ensure hygienically compliant air exchange in blood-draw rooms.

  • HVAC and cooling design including hygienic requirements
  • Installation of multi-split systems in consultation rooms with emphasis on low noise
  • Mechanical ventilation for blood-draw and laboratory rooms
  • Filtration and indoor air quality monitoring
  • Staff training and establishment of a maintenance plan

Outcome

Consultation rooms maintain the set temperature even during hot summers, noise levels in waiting areas remain below the limit, and the polyclinic has documented indoor air quality measurements.

Project Parameters

Location
Písek, Jihočeský kraj
Completed
February 2026
Area Served
3 100 m²
Duration
5 měsíců
Category
Cooling, HVAC

Technologies Deployed

VRF system Mechanical ventilation Air filtration CO₂ monitoring

Do You Have a Similar Property?

Write us a few sentences and we will get back to you with a proposed approach.