Climate control for a gallery storage facility in Tábor
Collection items do not need cold — they need stability. Humidity must be maintained within a narrow range year-round.
Scope of Work
The gallery needed to maintain temperature and relative humidity within specified ranges in a new storage facility and have a verifiable record of conditions.
- HVAC design with precise humidity control
- Installation of a unit with both humidification and dehumidification
- Temperature and humidity sensors in individual storage sections
- Data logging and alarms to BMS with dispatch to a monitoring centre
- Service agreement with regular inspections
Outcome
The storage facility maintains humidity within the specified range, the gallery has a continuous record for insurance and loan purposes, and the monitoring centre is alerted to any deviation before anyone notices it in the morning.
Project Parameters
- Location
- Tábor, Jihočeský kraj
- Completed
- June 2025
- Area Served
- 1 450 m²
- Duration
- 4 měsíce
- Category
- HVAC, Service and Maintenance
Technologies Deployed
Next Project
Heating Retrofit of a Logistics Centre near the D1 Motorway
An energy audit showed that it was cost-effective to retain the distribution system and replace only the heat sources and controls. Gas consumption dropped by a third.
More information HVACCoolingHVAC and cooling for an office building in Karlín
Replacement of two AHU units and reconstruction of cooling distribution in a six-storey building — while tenants remained in full operation.
More information CoolingHVACAir conditioning and ventilation for a polyclinic in Písek
Consultation rooms, waiting areas, and a laboratory. Each with different requirements for air quality and noise levels — and nowhere could any noise be tolerated.
More informationDo You Have a Similar Property?
Write us a few sentences and we will get back to you with a proposed approach.